Seattle, WA Site Plans for Building Permits

Scaled site plans for eligible decks, sheds, fences and driveway projects inside Seattle city limits. Drawn online from GIS parcel lines and satellite imagery, delivered in 24 hours. Check SDCI's survey and critical-area requirements before ordering.

ORDER A SEATTLE SITE PLANSEE SEATTLE EXAMPLES
8,600+ five-star reviews100,000+ plans delivered since 2013Acceptance guarantee
Seattle fence site plan showing the proposed fence, pedestrian gates and driveway gate, identifying details removed
A real Seattle fence plan we drew, with proposed pedestrian and driveway gates. Address, street names and parcel ID removed.

Do I need a site plan for a Seattle permit?

For exterior work under an STFI permit, yes. SDCI Tip 316 asks for a site plan when you change the outside of an accessory structure or do exterior work on the site. Show all structures to scale, the proposed work, lot dimensions and distances to the lot lines. Not every small project needs a construction permit. A permit exemption does not waive zoning, tree, drainage or critical-area rules. A GIS-based plan cannot replace a required stamped survey.

Source: SDCI Tip 316: STFI permits (Oct. 29, 2026) · SDCI Tip 103: site plan requirements (Aug. 20, 2025) · 2021 Seattle Residential Code, Chapter 1 (PDF). Checked Nov 25, 2026.

What SDCI asks for on a basic site plan

Start with Tip 103, not just an aerial image. Its basic-plan checklist is below. SDCI may require an enhanced plan or additional specialist documents for your site. The full Tip includes the department's own diagrams.

  1. Lot identificationYour submitted plan needs the address, legal description and King County Assessor parcel number. We remove these only from the public examples below. SDCI Tip 103: site plan requirements (Aug. 20, 2025)
  2. North arrow and scaleTip 103 asks for north pointing to the top of the sheet. Tip 316 requires all structures to be shown to scale. SDCI Tip 103: site plan requirements (Aug. 20, 2025)
  3. Lot lines and dimensionsExisting and proposed lot lines, each dimensioned. We use GIS parcel data; send any deed, existing survey or verified measurements you have. SDCI Tip 103: site plan requirements (Aug. 20, 2025)
  4. All structures, existing and proposedInclude building footprints, retaining walls, patios, decks, porches and rockeries, with their sizes and shapes. SDCI Tip 103: site plan requirements (Aug. 20, 2025)
  5. Distances to lot lines and between structuresFront, side and rear distances for existing and proposed structures, and distances between structures, porches and decks. SDCI Tip 103: site plan requirements (Aug. 20, 2025)
  6. Streets, alleys and paved areasAdjacent street names and rights-of-way, alleys, and the location and dimensions of driveways, parking and other paved areas. SDCI Tip 103: site plan requirements (Aug. 20, 2025)
  7. Trees and protection areasWhere SMC Chapter 25.11 applies: Tier 1–4 tree information, retained-tree protection areas and fencing, including affected off-site trees. The 2026 tree rules changed protection areas: an arborist proposes the area and SDCI verifies it. SDCI trees and codes
  8. Critical-area information is separateTip 103 items 23–29 must be prepared and stamped by a Washington-licensed surveyor. We do not provide that stamped work. SDCI Tip 103: site plan requirements (Aug. 20, 2025)

Seattle rules by project

From SDCI’s 2021 Residential Code, Chapter 1 and the official STFI guidance. Source sections are in brackets; the linked forms below explain the project-specific rules. Construction-permit exemptions are not zoning approvals. Confirm your zone, site conditions and current requirements with SDCI before building.

Fences and retaining walls

  • A fence no more than 8′ high, without masonry or concrete elements above 6′, is generally exempt from a construction permit [SRC R105.2(4)]. SDCI says a fence in a flood-prone area still needs a permit.
  • The construction-permit threshold is not an allowed zoning height. SDCI publishes separate zoning height limits; check your zone and the fence's position before choosing its height.
  • A retaining wall no more than 4′ from the bottom of its footing to its top is exempt only if every condition is met: no surcharge or specified liquid impoundment, no ECA or ECA buffer, no support for soils in the listed slope or slide areas, and no likely damage to adjoining property or structures if it fails [SRC R105.2(6)].
  • Retaining-wall and rockery drawings commonly need a professional stamp. The site plan is not that engineered design [SDCI retaining-wall guidance].

Your plot plan should show: Fence runs and gates with lengths; wall location, length and height; distances to lot lines, structures and affected slopes. Provide the engineer's design separately where required.

See Seattle fence plans ↓

Sheds and detached garages

  • The residential-code exemption for a one-story detached storage shed uses projected ROOF area, not just floor area: no more than 120 sq ft, with no concrete foundation other than a slab on grade [SRC R105.2(3)].
  • SDCI's shed page also limits the exemption to an unattached, generally unoccupied shed outside or away from an ECA. Other sheds need a permit. Zoning still controls size, height, coverage and placement.
  • SDCI's garage guidance allows the STFI route for a qualifying garage no larger than 750 sq ft, one story without a roof deck, with beams spanning no more than 14′, outside an ECA. Larger or more complicated work needs plan review.
  • Do not assume a standard rear or side setback works on every lot. Confirm the zoning and required setbacks with SDCI before locating the structure.

Your plot plan should show: The shed or detached garage footprint, dimensions, distances to lot lines and other structures, driveway access and existing buildings. Construction details are separate.

See Seattle detached garage plans ↓

Decks and patios

  • SDCI says a deck needs a permit if it is more than 18″ above ground, is a roof deck, or is in an ECA [SDCI deck guidance].
  • A deck more than 8′ above ground, with beams 14′ or longer, over 750 sq ft, with solid-surface flooring, on a roof or in an ECA does not use the ordinary STFI route [SDCI deck guidance].
  • Deck placement and lot coverage depend on height, zone and site conditions. An ECA can change the rules even for a low deck.
  • Patio and concrete slabs on grade are listed as minor work exempt from the residential building permit, provided no building-envelope changes are made [SRC R105.2(2)]. Other applicable rules still apply.

Your plot plan should show: Deck or patio footprint, dimensions, deck height, stairs, distances to lot lines and buildings, and affected trees. We draw the site plan, not structural framing or ledger details.

See Seattle site plans ↓

Driveways, paving and curb cuts

  • A new driveway opening through an existing sidewalk curb needs a curb cut permit. A stand-alone application goes through SDOT; SDCI coordinates the width, location and number of curb cuts against Tip 103 and SMC 23.54.030.F [SDCI curb cut guidance].
  • A curb cut permit does not approve changes to right-of-way landscaping. That requires separate SDOT Urban Forestry permission [SDCI curb cut guidance].
  • The residential code exempts platforms, walks and driveways no more than 18″ above grade and not over a basement or story below [SRC R105.2(7)]. That does not waive land-use, drainage, grading or right-of-way requirements.
  • Adding or replacing 750 sq ft or more of paving needs a grading permit; resurfacing existing paving does not. More than 5,000 sq ft of new or replaced paving requires a civil engineer [SDCI paving guidance].

Your plot plan should show: The entire driveway and proposed opening, widths, parking, sidewalk, curb, nearby trees and street features. Tell us what SDOT or SDCI asked for.

See Seattle driveway access plans ↓

Pools and spas

  • The residential-code construction-permit exemption is limited to prefabricated pools, spas and similar equipment with walls entirely above adjacent grade and capacity no more than 5,000 gallons [SRC R105.2(9)]. Do not apply that exception to an in-ground pool.
  • Permit exemption is not an exemption from other city requirements. Ask SDCI which construction, barrier, electrical and other documents your pool needs before ordering a plan.

Your plot plan should show: The pool or spa footprint and dimensions, nearby structures, lot-line distances, equipment and the proposed barrier/gates. Supply any required specialist design separately.

See Seattle site plans ↓

Seattle site plans we've drawn

Real plans for real Seattle permits. Addresses, street names and owner details removed. Click a plan to see it full size.

Web images are resized and are not to scale. Your plan arrives as a scaled PDF.

Submitting your permit in Seattle

Seattle Department of Construction and Inspections (SDCI)

700 5th Avenue, Suite 2000, Seattle, WA 98104

(206) 684-8600 · SCI_ASC_Support@seattle.gov

Phone, chat and information desk: Mon/Wed/Fri 9 am–3 pm; Tue/Thu 10:30 am–3 pm.

Apply and upload plans through the Seattle Services Portal. The email above is specifically for pre-application/pre-submittal support; use SDCI's question form or customer-service phone for general help. The assistance desk for language or technical access is on the Municipal Tower's 4th floor, not Suite 2000. Check parcel jurisdiction first: a Seattle mailing address is not proof of city limits. See official contact options below.

Jurisdiction
This page is for Seattle city limits. Use the King County Parcel Viewer jurisdiction field before choosing a permit office; nearby incorporated cities have their own permitting. King County Parcel Viewer: check jurisdiction
Plan review
For STFI applications, SDCI describes screening as taking a few days, with more information sometimes requested. This is not a guaranteed issue date or a full-plan-review timeline. SDCI subject-to-field-inspection process
Permit fees
STFI fees depend on project value, with an additional technology fee. City fees are separate from our drafting price. SDCI subject-to-field-inspection process
2026 hourly rate
The published 2026 SDCI base hourly rate is $292. This is not a flat permit price or a quote for your application. 2026 SDCI fee changes (PDF)
Codes
2021 Seattle Residential Code: the 2021 IRC with Seattle amendments. Check zoning, tree, stormwater and critical-area rules as well. Seattle Residential Code
ECA sites
SDCI requires a topographic survey for covered exterior work on steep-slope or known-slide sites, unless a modification is granted. Other ECA reports can also be required. SDCI subject-to-field-inspection process

Official forms and maps

Links checked Nov 25, 2026. Requirements change. Confirm with the city before you submit.

Choose your Seattle site plan

Basic Plot Plan

$99
  • Lot lines from GIS parcel data
  • Main building roofline
  • North arrow

For early Seattle planning. Not enough for most exterior permit applications.

CHOOSE BASIC
PERMIT-READY · MOST POPULAR

Medium Site Plan

$119
  • Everything in Basic
  • Existing structures, driveway, trees and pool
  • Measurements to the GIS parcel lines

Our permit-ready recommendation for eligible Seattle accessory projects when SDCI allows a non-certified plan. Not a stamped ECA plan.

CHOOSE MEDIUM

Detailed Site Plan

$159
  • Everything in Medium
  • Paths, patios, landscaping and gazebos
  • Septic and utilities you tell us about

For a busy Seattle lot or more supplied site detail. It does not replace a survey, arborist assessment or engineered drainage design.

CHOOSE DETAILED

Add-ons at checkout: a structure that isn't built yet (your new shed, pool or fence), impervious surface calculation, custom sheet size, rush.

Order online

Give us the address and what you're building. Add your deed, an old survey or the city's comments if you have them.

We draw it

A drafter draws your plan from GIS parcel data and current satellite imagery. No site visit.

PDF in 24 hours

Your scaled plan arrives by email, ready to print or attach to your application.

Acceptance guarantee. If your permit office rejects your site plan, we'll revise it for free. If it's still not accepted after that revision, you get a full refund. Excludes plans that require a surveyor's or engineer's stamp.

What Seattle customers say

★★★★★
We required a number of changes and My Site Plan took care of these for me without complaint and they took care of them quickly each time. Thank you My Site Plan.
Chuck C. · Seattle · verified buyer

Plot plan, survey or something else?

We draw

Scaled, non-certified site plans from GIS parcel data for decks, fences, sheds, detached garages, carports, patios, pools, driveways and retaining walls. We can draw supplied tree, utility and proposed-work information. No site visit or boundary determination.

You need a surveyor when

You're building a new home or an addition (we don't draw those), SDCI asks for a stamped survey, or a boundary is in doubt. Tip 103 requires the ECA site-plan items 23–29 to be prepared and stamped by a Washington-licensed surveyor. GIS parcel lines do not settle a boundary dispute.

You need another professional when

You need structural, drainage or geotechnical design, or an arborist to identify trees and establish protection areas. SDCI's ECA review can require specialist reports. A plan showing a retaining wall, pool or tree does not supply that design or authorize tree removal.

Seattle site plan questions

Will SDCI accept a MySitePlan drawing?

SDCI publishes basic-site-plan requirements in Tip 103 and says shed, deck and garage drawings rarely need an architect's or engineer's stamp. That is not a blanket survey waiver: critical-area work or uncertain boundaries can need a licensed surveyor, and separate engineered drawings may be required. Confirm the documents for your site before ordering. If your permit office rejects your site plan, we'll revise it for free. If it's still not accepted after that revision, you get a full refund. Excludes plans that require a surveyor's or engineer's stamp.

Does a Seattle mailing address mean SDCI issues my permit?

No. Check the jurisdiction in King County's Parcel Viewer. This page covers Seattle city limits only, not every Seattle postal address. Nearby Shoreline, for example, has its own city permit process and eTRAKiT portal. If the parcel is in another incorporated city or unincorporated King County, use that jurisdiction's permit office and checklist.

Can you prepare my environmentally critical area site plan?

Not the stamped work. Tip 103 requires ECA items 23–29 to be prepared and stamped by a Washington-licensed surveyor. SDCI's STFI guidance also requires a topographic survey for covered exterior work on steep-slope or known-slide sites unless the city grants a modification. Geotechnical reports can be required for additional hazard types. Check SDCI's map and get coaching before ordering.

What tree information must be on the plan?

For projects subject to SMC Chapter 25.11, Tip 103 asks for Tier 1–4 tree locations, species and diameters at 4.5 feet above ground, including affected off-site trees. It also asks for retained-tree protection areas and fencing and the city's protection detail in the plan set. SDCI's 2026 tree-code guidance says the protection area is proposed by a project arborist and verified by SDCI [SMC 25.11.060.A]. Supply verified information: satellite imagery does not establish species, trunk size, roots or protection areas.

Is a small shed automatically permit-free?

No. The residential-code exception uses a maximum 120-square-foot projected roof area for a one-story detached accessory shed and excludes a concrete foundation other than a slab on grade [SRC R105.2(3)]. SDCI's shed guidance adds site and use conditions, including ECA limits. Even an exempt shed must meet zoning and other applicable requirements.

Is an eight-foot fence allowed without checking zoning?

No. The construction-permit exemption in SRC R105.2(4) is not zoning permission for that height everywhere. SDCI lists separate zoning height limits and requires a construction permit for fences in flood-prone areas. Check your zone, setback location, retaining-wall conditions and critical-area restrictions first.

Do I apply to SDCI or SDOT for a curb cut?

For a stand-alone curb cut, SDCI directs you to apply through SDOT. SDCI then works with SDOT to check width, location and number of curb cuts against SMC 23.54.030.F and Tip 103. A curb cut linked to a building permit is handled with that permit. Right-of-way landscaping changes need separate SDOT Urban Forestry permission.

Is the site plan the complete permit drawing set?

No. Tip 316 describes a site plan as the scaled location drawing for exterior work. Your application may also need construction sections, framing or engineering, tree information, drainage documents, surveys or specialist reports. Send us the city's checklist and comments; we draw the site-plan portion, not those professional designs.

Get your Seattle site plan by this time tomorrow

A scaled site-plan PDF for eligible Seattle projects. Confirm survey, ECA and specialist requirements first; send us the city's checklist with your order.

ORDER A SEATTLE SITE PLAN

More Washington permit offices: Washington site plans

×