Site plans by state › Missouri › St. Louis County

St. Louis County, MO Site Plans for Building Permits

Scaled site plans for decks, patio covers, sheds and other accessory work in the county's permit service area. Drawn online from GIS parcel lines and satellite imagery, delivered in 24 hours. Check your jurisdiction first: a St. Louis mailing address isn't enough.

ORDER A ST. LOUIS COUNTY SITE PLANSEE ST. LOUIS COUNTY EXAMPLES
8,600+ five-star reviews100,000+ plans delivered since 2013Acceptance guarantee
A real unincorporated St. Louis County proposed-deck site plan, identifying details removed
A proposed deck in unincorporated St. Louis County. Address, street name, house number and parcel ID removed.

Do I need a site plan for a St. Louis County permit?

For a deck, shed or retaining-wall permit, the county's checklists ask for one. Show the lot, existing structures, proposed work and distances to the lot lines. First confirm the office: the county handles unincorporated areas and municipalities contracting for the relevant code service. Chesterfield and Fenton contract for residential building review; Ballwin, Hazelwood and Maryland Heights do not. Municipal zoning approval can still be separate. The independent City of St. Louis is not this office.

Source: County deck and covered-deck checklist · County detached-utility-shed checklist · County residential retaining-wall guide (PDF) · Municipality contracts — revised August 3, 2026 · County Residential Building office and resources. Checked Nov 25, 2026.

What St. Louis County asks for on a site plan

Start with the county's checklist for your exact work. The deck, shed and retaining-wall guides overlap, but each asks for details the others don't. These are checklist items, not annotations on a customer's plan.

  1. Lot layout, north and street namesShow the lot configuration, north arrow, lot number, subdivision and adjoining streets. These identifying details belong on your permit PDF; we remove them from public examples. County deck and covered-deck checklist
  2. Existing structuresShow and label what's already on the lot, including retaining walls, pools and sheds. County deck and covered-deck checklist
  3. Proposed work and distancesFor a deck, give overall length and width, floor height above grade, and distances to lot lines and other structures. A covered deck also needs roof-overhang outlines and distances. County deck and covered-deck checklist
  4. Setbacks and easementsDimension the setbacks and easements. Send us your zoning information and any recorded documents; GIS parcel data alone does not establish easement locations. County deck and covered-deck checklist
  5. Wells, septic systems and swalesShow existing wells, septic areas and swales. Tell us about features not visible in aerial imagery. County deck and covered-deck checklist
  6. Runoff arrowsThe shed guide asks for arrows showing runoff direction. Do not place the shed so it obstructs a swale or runoff. County detached-utility-shed checklist
  7. Retaining-wall heightsLabel the high side, and top-of-wall and bottom-of-wall heights or elevations at the ends, middle and turns. Show perpendicular distances to lot lines and other structures. County residential retaining-wall guide (PDF)
  8. Municipal zoning approvalInside a contracting municipality, submit the municipality-approved site plan and its approved zoning paperwork as the applicable guide directs. County review does not replace municipal zoning. County deck and covered-deck checklist

St. Louis County rules by project

From the county’s residential guides, construction-permit page and adopted code. Section references are in brackets. Confirm the zoning district and municipal requirements for your parcel before building.

Decks and patio covers

  • The county lists decks and patio covers among work requiring a building permit [construction-permit page].
  • For a deck, submit a site plan plus separate pier, framing, elevation, stair and connection drawings [deck checklist; B107.2.1; R107.1].
  • Show the deck's floor height and roof-overhang distances for a covered deck. Do not substitute roof dimensions for the deck footprint.
  • Structural alterations or work beyond prescriptive code limits may require sealed drawings and calculations [deck checklist; R301.1.3].

Your plot plan should show: The deck or patio-cover footprint, size, lot-line distances and surrounding structures. We draw the site plan, not the framing or engineered connections.

See St. Louis County deck and patio-cover plans ↓

Retaining walls

  • A permit is required when a wall exceeds 3′; exceeds 2′ with a driveway, pool or other surcharge; is no farther from a lot line than its own height; or has a combined wall-and-fence/guard height over 6′ [wall guide; B105.2].
  • For the permit exemption, codified B105.2 measures from finished grade on the non-retained side to the top of the wall. The guide describes grade-to-grade height; show both and confirm the county's measurement for your wall.
  • In unincorporated county, the guide applies yard zoning setbacks to walls taller than 6′ and to wall-and-fence/guard combinations over 6′.
  • Do not block swales or natural runoff. No part may cross a lot line without a recorded construction and maintenance easement [wall guide].
  • Engineering is separate: the guide lists conditions requiring sealed structural plans and calculations. A manufacturer's county-approved master-plan system may be an option for qualifying block walls.

Your plot plan should show: The wall's full route, segment heights, high side, top and bottom elevations/heights, perpendicular offsets, drainage arrows and construction entrance. Supply the height and grade information; aerial imagery cannot establish it.

See St. Louis County example plans ↓

Sheds and detached accessory buildings

  • The shed guide covers sheds over 120 sq ft or over 10′ high, measured to the midpoint of a sloped roof. Above 400 sq ft, use the county's detached-garage checklist [shed guide].
  • A building-permit exemption is not zoning approval. The county's construction page describes a small-shed exemption with height, use and front-yard conditions.
  • The site plan must locate the shed, show distances to lot lines and other structures, and show runoff directions [shed checklist; B107.2.1].
  • Separate foundation, floor, roof-framing, elevation and assembly drawings are required for permitted sheds; engineered truss drawings may also be required.

Your plot plan should show: The proposed shed or detached building, its dimensions and offsets, existing structures, wells/septic areas and runoff arrows.

See St. Louis County example plans ↓

Fences and pool barriers

  • The codified building-permit exemption covers ordinary rear- or side-yard fences not more than 7′ high, except pool/spa/hot-tub enclosures. Electrified or barbed/razor-type fences are not exempt [1115.101, B105.2(4); 1116.101, R105.1].
  • An exemption from a building permit does not waive zoning, corner visibility or a municipality's requirements.
  • Pool barriers are expressly excluded from the ordinary-fence exemption [B105.2(4)].

Your plot plan should show: Fence runs, height and material, gates, the pool or spa if applicable, and distances to lot lines and nearby structures.

The county's construction-information page still says 6′ for the ordinary rear/side fence exemption; the codified B105.2(4) says 7′. We follow the code here. Confirm the applicable zoning and permit treatment with the county before relying on the exemption.

See St. Louis County example plans ↓

Pools and pool decks

  • The county construction page exempts entirely above-ground pools only when wall height is under 26″ and water depth under 24″, with its stated front-yard condition; it says other pools, including inflatable pools, require a building permit.
  • A pool-deck site plan does not replace the pool's construction documents, deck framing drawings or barrier information.
  • The county code index lists the locally amended 2015 Swimming Pool and Spa Code [Chapter 1118]. Check the current pool submittal requirements with the county and your installer.

Your plot plan should show: The pool, deck, stairs, barrier, gates and equipment locations, with dimensions and lot-line distances. Send the installer's pool documents separately.

See St. Louis County pool-deck plans ↓

Driveways and paving

  • The county construction page lists on-grade driveways and parking within the lot, not more than 12″ above grade, as building-permit-exempt work.
  • Any driveway work beyond the curb in county right-of-way needs a separate Transportation and Public Works special-use permit [construction-permit page].
  • County building-permit exemptions do not settle municipal zoning or another right-of-way owner's approval.

Your plot plan should show: Existing and proposed paving, width and length, lot-line distances, the street connection and any changed drainage.

See St. Louis County example plans ↓

St. Louis County site plans we've drawn

Real plans for real St. Louis County permits. Addresses, street names and owner details removed. Click a plan to see it full size.

Web images are resized and are not to scale. Your plan arrives as a scaled PDF.

Submitting your permit in St. Louis County

Transportation & Public Works — Code Enforcement

41 South Central Avenue, 6th Floor, Clayton, MO 63105

(314) 615-5184 · permits@stlouiscountymo.gov

Monday–Friday, 7:30 am–4:00 pm

Start with the county's Residential Building and permit-procedure pages, then use the linked Permitting Portal. Submit the checklist's electronic application and drawings. In a contracting municipality, obtain the required municipal zoning approval too. Office location, phone and hours: Residential Building; email: County Permit Processing.

Jurisdiction
Use County Property Lookup to identify the municipality, then check its current contract entry for the service you need. Mailing city and ZIP are not jurisdiction tests. Municipality contracts — revised August 3, 2026
Plan review
Ask Permit Processing about the current queue. The county offers While-You-Wait review for qualifying small residential work; drawings must print at scale on 8½″ × 11″ paper. While-You-Wait and accelerated plan reviews
Permit fees
Residential fees are based on estimated construction cost plus a processing fee. Ordinance 29,445 also authorizes annual processing-fee changes effective July 31; confirm the current total rather than use an old fee sheet. Fee amendment: Ordinance 29,445 (2025 PDF)
Accelerated review
For qualifying applications, the published premium is 50% of the regular permit fee, with a $500 minimum, in addition to the regular fee. It targets half the usual review time or less, not a fixed approval date. While-You-Wait and accelerated plan reviews
Codes
The county's index lists the 2015 IRC, 2015 IBC and 2015 Swimming Pool and Spa Code with local amendments. Contracting municipalities may still have separate zoning rules. County codes and ordinances

Official forms and maps

Links checked Nov 25, 2026. Requirements change. Confirm with the city before you submit.

Choose your St. Louis County site plan

Basic Plot Plan

$99
  • Lot lines from GIS parcel data
  • Main building roofline
  • North arrow

Good for planning. Not enough for most county accessory-project permit checklists.

CHOOSE BASIC
PERMIT-READY · MOST POPULAR

Medium Site Plan

$119
  • Everything in Basic
  • Existing structures, driveway, trees and pool
  • Measurements to the GIS parcel lines

Our permit-ready pick for county accessory work when an unsealed site plan is appropriate.

CHOOSE MEDIUM

Detailed Site Plan

$159
  • Everything in Medium
  • Paths, patios, landscaping and gazebos
  • Septic and utilities you tell us about

For crowded lots, patio work, or the extra site features the county asks you to show.

CHOOSE DETAILED

Add-ons at checkout: a structure that isn't built yet (your new shed, pool or fence), impervious surface calculation, custom sheet size, rush.

Order online

Give us the address and what you're building. Add your deed, an old survey or the city's comments if you have them.

We draw it

A drafter draws your plan from GIS parcel data and current satellite imagery. No site visit.

PDF in 24 hours

Your scaled plan arrives by email, ready to print or attach to your application.

Acceptance guarantee. If your permit office rejects your site plan, we'll revise it for free. If it's still not accepted after that revision, you get a full refund. Excludes plans that require a surveyor's or engineer's stamp.

Plot plan, survey or something else?

We draw

Scaled site plans from GIS parcel data for decks, patio covers, pools, fences, sheds, detached garages, carports, driveways, retaining walls and other accessory work. Send your office's checklist, zoning requirements and the work's dimensions.

You need a surveyor when

You're building a new home or an addition (we don't draw those), the county or municipality asks for a stamped survey, or a boundary is in doubt. GIS parcel lines don't settle a boundary dispute.

You need another professional when

The county requires structural engineering, sealed drawings, retaining-wall calculations or drainage design. Our site plan does not replace these. Deck framing and connections are separate, and the retaining-wall guide sets specific engineering conditions.

St. Louis County site plan questions

Will St. Louis County accept a MySitePlan site plan?

The county publishes site-plan checklists for decks, sheds and retaining walls, but acceptance depends on your exact work, site conditions and any municipal requirements. Ask whether an unsealed site plan is appropriate before ordering; we do not supply a professional seal. If your permit office rejects your site plan, we'll revise it for free. If it's still not accepted after that revision, you get a full refund. Excludes plans that require a surveyor's or engineer's stamp.

Is my St. Louis mailing address in the county's permit jurisdiction?

Not necessarily. Use County Property Lookup to identify the municipality and check the county's Municipality Contracts list for Residential Code service. Our example parcels were checked against county GIS municipality data and are in unincorporated St. Louis County. The independent City of St. Louis is a separate office, not this county department.

Does the county issue building permits for every municipality?

No. The August 3, 2026 contract list includes residential-code service for Chesterfield and Fenton, but not Ballwin, Hazelwood or Maryland Heights. Contracts are service-specific: a city may use the county for electrical permits but not a deck's building permit. Check the exact service, not just whether the city appears in the list.

What does the county need besides a deck site plan?

Its deck guide lists pier and framing plans, elevations, stair and connection details, and roof information for a covered deck. The site plan shows the footprint, dimensions, floor height, lot-line distances and existing site features. We draw that site plan; your builder or design professional supplies the construction details.

Does a short retaining wall need a permit?

It can. The county guide requires a permit if the wall exceeds 3 feet, exceeds 2 feet with a surcharge, is no farther from a lot line than its own height, or combines with a fence or guard to exceed 6 feet. Show wall heights and drainage, not just its length. The guide also identifies when structural plans and calculations need a Missouri professional's seal.

Do I still need municipal zoning approval?

Yes, where the county's checklist requires it for a municipal site. The deck guide asks for the site plan electronically stamped, signed and dated approved by the municipality's zoning officer, plus the approved zoning letter or receipt. That municipal approval is different from an engineer's or surveyor's professional seal.

Can I use the six-foot fence exemption on the county information page?

Check the current code instead of relying only on that summary. The construction-information page says 6 feet, but codified B105.2(4), applied through residential R105.1, exempts ordinary rear/side-yard fences not more than 7 feet, with exceptions including pool barriers and electrified or barbed/razor-type fencing. Zoning and municipal rules still apply.

How long will my permit review take?

Our 24-hour delivery is for your drafted site-plan PDF, not county approval. Ask the county about its current review queue. While-You-Wait service is limited to qualifying small residential work and printable scaled drawings. The accelerated-review program is a separate, paid county service with an additional fee of 50% of the regular permit fee, subject to a $500 minimum.

Get your St. Louis County site plan by this time tomorrow

Drawn for your accessory work using the county's checklist. Confirm jurisdiction and any seal requirements before ordering.

ORDER A ST. LOUIS COUNTY SITE PLAN

More Missouri permit offices: Missouri site plans

×