Cobb County, GA Site Plans for Deck & Accessory Permits
For addresses in unincorporated Cobb County: scaled plans drawn online from GIS parcel lines and satellite imagery, delivered in 24 hours. Start with the county's project checklist—and confirm whether your project needs a registered professional before you order.
ORDER A COBB COUNTY SITE PLANSEE COBB COUNTY EXAMPLES
Do I need a site plan for a deck permit in Cobb County?
The county's deck checklist asks for a plat or a site plan. Its attached-structure checklist covers decks and patios and accepts a “Recorded survey/plat of property” marked with the proposed work, “or site plan showing proposed build.” The detached-accessory checklist gives the same option. However, Cobb’s general codes page says that in most cases a Georgia-registered surveyor, engineer or architect prepares the site plan. Confirm which requirement applies to your project before ordering. This page covers unincorporated Cobb—not the separate city permit offices. Pools require a sealed design and are not examples of our non-certified permit service.
Source: Residential building permits and project checklists · Attached-structure checklist, January 2026 (PDF) · Accessory Structure checklist, Rev. January 2026 (PDF) · Codes, Standards, and Guidelines · Pool checklist, May 2026 (PDF). Checked Nov 25, 2026.
What to gather for Cobb County's site-plan review
The county publishes project checklists rather than a general residential sample drawing we could verify. These points come from its checklists and its Site Plan Review description. They do not waive a professional-preparation or seal requirement.
- The proposed work in the right placeThe deck checklist accepts a recorded survey/plat with a box showing the work, or a site plan showing the proposed build. Detached accessory structures have the same option. Residential building permits and project checklists
- A drawing of the structure, tooThe checklist asks for a basic drawing of what you propose to build as well as the plat/site plan. A site layout is not deck framing or an engineered design. Attached-structure checklist, January 2026 (PDF)
- A clear scope and job costInclude a scope-of-work letter and the customer contract or estimate/invoice. The county asks that the scope letter be kept to one page when possible. Residential building permits and project checklists
- Setbacks confirmed by ZoningThe residential process sends plans to Zoning to establish eligibility, setbacks and any need for a variance. Check the district and lot-specific stipulations, not a single countywide setback number. Residential building permits and project checklists
- Subdivision plans, buffers and easementsReviewers compare the proposal with subdivision civil plans and the final plat; they check tree rules, state water buffers, drainage and overhead or underground utilities and easements. Site Plan Review
- Septic approval when applicableThe deck and accessory checklists require Environmental Health's red-stamped project approval for properties on septic. Residential building permits and project checklists
- The permit application and credentialsUse the current project checklist. Include the signed residential application, required identification, licenses and any authorized-agent paperwork. Accessory Structure checklist, Rev. January 2026 (PDF)
- Written confirmation if a professional is requiredThe general codes page says most building-permit site plans are drawn by a Georgia-registered surveyor, engineer or architect. We do not supply a professional stamp. Codes, Standards, and Guidelines
Cobb County rules by project
From Cobb County’s residential checklists, Building and Development FAQs and current codes guidance. These are unincorporated-county rules. The Zoning Division determines district setbacks and lot-specific stipulations; confirm them before building.
Decks, replacement decks and stairs
- The attached-structure checklist specifically includes decks and patios. It asks for the plat/site plan, scope letter, job-cost documentation and a basic structure drawing.
- The published permit exemption is narrow: a detached deck no more than 200 sq ft, no more than 30″ above grade at any point, not attached to a dwelling, and not serving the required exit door. All conditions must apply.
- Zoning establishes the applicable setbacks and whether a variance is needed. Do not assume a like-for-like replacement avoids review.
Your plot plan should show: The deck footprint, stairs and landings, dimensions and distances to the nearest GIS parcel lines, with existing structures identified. Send any recorded plat and the county's comments.
See Cobb County deck plans ↓Screen enclosures and patio covers
- Cobb's codes page lists covered and uncovered decks among work needing Zoning approval; its attached-structure checklist also covers patios.
- Use the checklist that matches the actual scope. A roofed or screened structure is not the same as a small detached deck under the exemption.
- The general professional-plan warning still applies. We draw the site layout, not roof loads, footings or engineered framing.
Your plot plan should show: The proposed enclosure or cover, its dimensions, the existing patio or pad, the house and distances to the GIS parcel lines.
See Cobb County screen-enclosure plans ↓Sheds and detached accessory buildings
- The January 2026 accessory checklist covers sheds, storage buildings and similar detached structures. It accepts a marked recorded survey/plat or site plan showing the proposed building.
- The FAQ's small-shed exemption applies only to a one-story structure no larger than 120 sq ft, without a permanent foundation or electrical, plumbing, HVAC or gas connections, at least 5′ from all lot boundaries and below 35′ tall.
- The FAQ warns that zoning stipulations may impose further restrictions. A building-permit exemption is not a waiver of zoning.
Your plot plan should show: The proposed structure's size and position, existing buildings, and distances to the GIS parcel lines. Have Zoning confirm the district-specific placement rules.
See Cobb County deck and screen-enclosure plans ↓Fences and retaining walls
- The county FAQ lists fences as building-permit-exempt, but says Zoning's height limitations still apply. Confirm height and placement before installing a fence.
- The residential checklist says retaining walls 30″ and taller must be permitted. The FAQ also excludes a wall supporting a surcharge from its small-wall exemption.
- Retaining-wall applications require a site plan and engineered design. The FAQ calls for a site plan and design detail signed and sealed by a Georgia professional engineer; our non-certified plan does not replace that requirement.
Your plot plan should show: For fence planning, the runs, lengths, gates and nearby structures. For a retaining wall, use the professional required by the county to prepare the permit documents.
See Cobb County deck and screen-enclosure plans ↓Driveways and paving
- The FAQ lists sidewalks and driveways among building-permit-exempt work, but sidewalks may not be poured in the right-of-way.
- Adding or relocating a driveway requires Department of Transportation approval. That is separate from the building-permit exemption.
- Reviewers check drainage, buffers, easements and utilities. Confirm whether your scope needs Site Plan Review or a land-disturbance permit before work begins.
Your plot plan should show: The existing and proposed paved areas, driveway connection and dimensions, with any known easements, drainage features and county comments.
See Cobb County deck and screen-enclosure plans ↓Pools and spas: a sealed design is required
- The county says in-ground and above-ground pools in unincorporated Cobb must be permitted and inspected.
- The May 2026 residential pool checklist requires a proposed pool design signed and sealed by a Georgia-registered land surveyor, professional engineer or landscape architect.
- Our non-certified plans do not meet that sealed-design requirement. We have deliberately left pool plans out of the examples on this page.
Your plot plan should show: Have the required licensed professional prepare the pool design and the county's pool-specific site-plan documents.
See Cobb County deck and screen-enclosure plans ↓Cobb County site plans we've drawn
Real plans for real Cobb County permits. Addresses, street names and owner details removed. Click a plan to see it full size.
Web images are resized and are not to scale. Your plan arrives as a scaled PDF.
Submitting your permit in Cobb County
Cobb County Community Development — Residential Permitting
1150 Powder Springs Street, Suite 400, Marietta, GA 30064
(770) 528-2060 · residentialpermitreview@cobbcounty.gov
Monday–Friday, 8:00 am–5:00 pm; permits issued 8:00 am–4:30 pm.
For residential building permits, email a complete application packet or walk in/drop it off at the permit office. The online inspection service is not the same as application intake. Separate land-disturbance applications moved to the DPR portal on October 19, 2026.
- Review allowance
- The residential page lists 10–14 business days for email, or 0–3 business days for walk-in/drop-off. The January accessory checklist separately says allow up to 10 business days. Confirm the current queue; these are not approval promises. Residential building permits and project checklists
- County fees
- The published residential schedule is construction-value based. It also lists a $100 site-plan review fee for decks and accessory structures and a $15 technology fee. These are county fees, separate from our drawing price. Development and inspection fees, effective July 1, 2024
- Current codes
- 2024 IRC and IBC with Georgia Amendments (2026), effective January 1, 2026. The older linked Development Standards still prints earlier code editions; use the current codes page. Codes, Standards, and Guidelines
- Is this your permit office?
- Marietta, Kennesaw, Smyrna, Acworth, Powder Springs, Austell and Mableton issue their own permits. Check the county's city-limit lookup rather than relying on the mailing city. County city-limit lookup
Official forms and maps
- Residential building permits and project checklists
- Attached-structure checklist, January 2026 (PDF)
- Accessory Structure checklist, Rev. January 2026 (PDF)
- Residential permit application (PDF)
- Homeowner permit checklist (PDF)
- Retaining-wall checklist, March 2026 (PDF)
- Pool checklist, May 2026 (PDF)
- County city-limit lookup
- Zoning Division FAQs
- Codes, Standards, and Guidelines
- Development and inspection fees, effective July 1, 2024
- Site Plan Review
- City of Marietta building permits
- City of Kennesaw Building Services
- City of Smyrna Building Division
- City of Acworth Building Services
- City of Powder Springs building permits
- City of Austell Community Affairs
- City of Mableton building permits
Links checked Nov 25, 2026. Requirements change. Confirm with the city before you submit.
Choose your Cobb County site plan
Basic Plot Plan
- Lot lines from GIS parcel data
- Main building roofline
- North arrow
Good for early planning. Not our recommendation for a Cobb exterior-permit submission.
CHOOSE BASICMedium Site Plan
- Everything in Basic
- Existing structures, driveway, trees and pool
- Measurements to the GIS parcel lines
Our permit-ready recommendation for eligible deck and accessory work, after Cobb confirms a non-certified plan is suitable.
CHOOSE MEDIUMDetailed Site Plan
- Everything in Medium
- Paths, patios, landscaping and gazebos
- Septic and utilities you tell us about
For a crowded lot or more detailed exterior layout. Not a substitute for Cobb's sealed pool or engineered-wall documents.
CHOOSE DETAILEDAdd-ons at checkout: a structure that isn't built yet (your new shed, pool or fence), impervious surface calculation, custom sheet size, rush.
Give us the address and what you're building. Add your deed, an old survey or the city's comments if you have them.
A drafter draws your plan from GIS parcel data and current satellite imagery. No site visit.
Your scaled plan arrives by email, ready to print or attach to your application.
Plot plan, survey or something else?
We draw
Non-certified scaled site layouts from GIS parcel data for eligible decks, fences, sheds, detached garages, carports, patios, patio covers, driveways, screen enclosures and trade-permit planning. Confirm the county's required plan preparer before ordering.
You need a surveyor when
You're building a new home or an addition (we don't draw those), the county asks for a stamped survey, or a boundary is in doubt. GIS parcel lines don't settle a boundary dispute.
You need another professional when
Cobb requires a sealed pool design from a Georgia-registered surveyor, engineer or landscape architect, and calls for professional engineering on retaining-wall documents. Deck framing and structural design are separate from our site layout.
Cobb County site plan questions
Will Cobb County accept a site plan from MySitePlan?
Its January 2026 deck and accessory checklists allow a marked recorded survey/plat or a site plan showing the proposed work. But its general codes page says that in most cases a Georgia-registered surveyor, engineer or architect prepares the site plan. Ask Residential Permitting which applies to your project before ordering; we do not provide a professional stamp. If your permit office rejects your site plan, we'll revise it for free. If it's still not accepted after that revision, you get a full refund. Excludes plans that require a surveyor's or engineer's stamp.
Does a Marietta or Kennesaw mailing address mean I use that city's office?
No. The county explains that mailing-city names follow USPS ZIP codes. Use Cobb's city-limit lookup. Marietta, Kennesaw, Smyrna, Acworth, Powder Springs, Austell and Mableton operate separate permit offices; this page is for unincorporated Cobb.
Can I skip the permit for a small deck?
Only if every published exemption condition applies: no more than 200 sq ft, no more than 30 inches above grade at any point, detached from the dwelling, and not serving its required exit door. Confirm zoning and any lot-specific conditions even if the deck is building-permit-exempt.
How close can my deck or shed be to the lot line?
There is no single number to use for every Cobb lot. The county's residential process has Zoning determine setbacks, eligibility and any need for a variance. Send your recorded plat and any zoning stipulations or variance approval with your order; GIS parcel data alone does not establish a legal boundary.
Can you draw the plan for my Cobb pool permit?
We cannot supply the sealed design required by Cobb's May 2026 pool checklist. It requires a Georgia-registered land surveyor, professional engineer or landscape architect to sign and seal the proposed pool design. The pool permit is separate from an ordinary deck or accessory submission.
Does my fence need a building permit?
The county's Building and Development FAQ lists fences as exempt from a building permit, but says height limitations still apply. Check height, location and any lot-specific restrictions with Zoning before installation. Retaining walls have separate permit and engineering requirements.
How do I submit, and how long does review take?
The residential page says to email a complete packet or walk in/drop it off. It publishes 10–14 business days for email and 0–3 business days for walk-in/drop-off; the accessory checklist separately says allow up to 10 business days. Confirm the current queue. The DPR portal change applies to separate land-disturbance submissions, not a blanket replacement for the residential page's intake instructions.
What if my property is on septic or near a creek?
The deck and accessory checklists require Environmental Health approval for septic properties. Site reviewers also check state water buffers, stormwater, flood hazards and easements against subdivision records. Have the county identify the required approvals before you order; we can show information you provide, not locate underground septic components remotely.
Get your Cobb County site plan by this time tomorrow
For eligible non-certified deck and accessory layouts in unincorporated Cobb. Confirm the required plan preparer with the county before ordering.
ORDER A COBB COUNTY SITE PLANMore Georgia permit offices: Georgia site plans