Atlanta, GA Site Plans for Building Permits

Scaled site plans for Atlanta decks, sheds and fences, drawn from GIS parcel lines and satellite imagery. Show the work, the setbacks and the existing lot. Delivered as a PDF in 24 hours. Tree-impact plans may need a separate tree professional.

ORDER AN ATLANTA SITE PLANSEE ATLANTA EXAMPLES
8,600+ five-star reviews100,000+ plans delivered since 2013Acceptance guarantee
An Atlanta replacement-deck site plan we drew, address removed
A real Atlanta replacement-deck plan. Address and street names removed. This lot is in a planned-development district; its layout is not a citywide setback standard.

Do I need a site plan for a permit in Atlanta?

For a fence, shed or deck application, the city's checklists ask for one. The Express checklists allow you to create a scaled site plan if an old survey is unavailable. Show the whole lot, its dimensions, the house, driveway, proposed work, setbacks and nearby trees. Tree protection and structural documents are separate requirements. This page is for City of Atlanta addresses, not every address with an Atlanta mailing city.

Source: Express fence checklist (PDF, Sept 2021) · Express sheds and decks checklist (PDF, Sept 2021) · Tree Protection Plan Checklist (2026, Phase 2 update) · Atlanta GIS: city limits layer. Checked Nov 25, 2026.

What the City of Atlanta asks for on a plot plan

This is the city's own published site plan illustration, with the features its permit checklists ask for marked on it. The drawing is an illustration, not a zoning determination for your lot.

City of Atlanta's published illustrative sample site plan1234567
The city's own illustrative sample, linked from its Express forms. The example dimensions, fence and accessory building are illustrations, not permission to use those dimensions on your lot.
  1. Scale and dimensionsUse a stated scale. The city's illustration shows a scale and north arrow; the Express checklists require scaled, dimensioned drawings. City sample site plan (PDF)
  2. Lot dimensions that match city recordsThe sample specifically says lot dimensions must match city records. If they don't, it calls for Zoning coordination and sign-off. City sample site plan (PDF)
  3. Existing and proposed structuresShow the house, shed or deck, driveway and other impervious surfaces. Make it clear which feature you are proposing. Express sheds and decks checklist (PDF, Sept 2021)
  4. Distances to the lot linesShow the distances from the fence, shed or deck to adjacent lot lines. The city's sample illustrates setback dimensions. Express sheds and decks checklist (PDF, Sept 2021)
  5. Driveways and accessKeep the existing driveway on the plan, even when the application is for a backyard feature. Express sheds and decks checklist (PDF, Sept 2021)
  6. Fences and gatesLocate fences and gates and show the distances to adjacent lot lines. Include construction information separately. Express fence checklist (PDF, Sept 2021)
  7. Easements and utilitiesThe city illustration labels utility and drainage easements. Site-work review also asks for existing and proposed easements. Residential site-work checklist (PDF, April 2022)
  8. Lot coverage and drawing labelThe sample asks for lot coverage calculations and the label “Released for Construction” at the bottom right. Nearby trees need separate attention under the 2026 checklist. City sample site plan (PDF)

Atlanta rules by project

Start with the city's Express fence checklist (PDF, Sept 2021), Express sheds and decks checklist (PDF, Sept 2021) and Residential site-work checklist (PDF, April 2022). Zoning and overlay rules depend on the lot; don't treat the dimensions on a sample as your allowed setbacks. The Tree Protection Plan Checklist (2026, Phase 2 update) applies to plans submitted on or after January 1, 2026. Older Express sheets still use a 30-foot no-tree test and older pool sheets list 2018 codes. Use the current tree checklist's 50-foot test and the Current Georgia construction codes instead. Pool applications also follow the Separate pool application policy (effective Jan 2, 2025).

Fences and retaining walls

  • The Express fence checklist calls for a scaled site plan locating the house, driveway, fence, gates and nearby trees, plus distances to adjacent lot lines.
  • Provide fence material, height, panel width, post sizes and the connection and footing details. A site plan is not a fence construction detail.
  • The residential site-work checklist asks for retaining-wall locations and top and bottom heights. Walls over 4′ must be designed and the plan sealed by a professional engineer.
  • Fence work still needs Arborist and Zoning review. The applicable zoning district and any historic or overlay rules determine the allowed location and height.

Your plot plan should show: The fence route and gates, dimensions, nearby trees, house and driveway; for a wall, its location and top and bottom heights.

See Atlanta example plans ↓

Sheds and detached accessory structures

  • The Express shed checklist requires the whole lot, lot dimensions, house, driveway, shed and other impervious surfaces, with distances from the shed to adjacent lot lines.
  • A scaled site plan can be created when an old survey is not available. That does not waive a survey requirement imposed for a particular site or review.
  • The checklist also asks for architectural and applicable structural drawings. Confirm whether your structure qualifies for Express before using that workstream.

Your plot plan should show: The proposed shed or detached structure with its size, distances to adjacent lot lines, existing structures, paving and nearby trees.

See Atlanta example plans ↓

Decks and patio covers

  • A deck application needs a scaled site plan as well as the architectural and applicable structural drawings in the city's Express checklist.
  • Show floor layout, posts, attachment, stairs and guardrails in the construction drawings. Engineered framing may require a Georgia engineer's or architect's stamp.
  • The checklist directs work requiring continuous footings to the Residential workstream rather than Express.

Your plot plan should show: The proposed deck or patio cover, stairs, size and distances to adjacent lot lines, together with existing impervious surfaces and nearby trees.

See Atlanta deck plans ↓

Pools, barriers and pool paving

  • Atlanta requires a swimming pool permit. The pool checklist asks for the pool in relation to the house, streets, driveways, walks, retaining walls and lot lines.
  • Show all existing and proposed conditions, including pool decking, the full continuous barrier and access gates. Construction sections and equipment details are separate.
  • Since January 2, 2025, pool construction applications must be separate from other permit applications, including retaining walls and pool houses. Separate trade permits and inspections are required.

Your plot plan should show: The pool, dimensions, deck or paving, equipment, complete barrier and gates, nearby structures and lot lines.

See Atlanta example plans ↓

Driveways and paving

  • For new or replacement aprons and curb cuts, the residential site-work checklist requires a survey and/or site plan for Traffic review, and a separate Traffic permit.
  • Significant grading requires a grading plan signed and sealed by a qualified professional. The checklist says a grading plan is not required for minor improvements with no grade changes and minimal land disturbance.
  • Site-work review asks for existing and proposed easements, soil and erosion controls and applicable stormwater information. A paving layout alone is not a grading or drainage design.

Your plot plan should show: Existing and proposed paved areas, dimensions, access and easements. A qualified professional handles any required grading or drainage design.

See Atlanta example plans ↓

Tree protection before you apply

  • Where trees may be affected, complete the required Arborist Meeting before submitting the permit application. The city says applications without that documentation will not be accepted.
  • The 2026 tree checklist asks for a tree survey no older than 2 years, affected critical root zones, disturbance limits, tree protection fencing and the relevant tree data [158-53]. Satellite imagery cannot supply measured tree diameters or a professional tree assessment.
  • The current no-trees-impacted route requires no trees within 50′ of proposed construction, at least two panoramic photos from different viewpoints and a signed Tree Impact Statement. Older Express sheets still show 30′; use the 2026 checklist.
  • Include affected neighboring trees and boundary trees, not just trunks on your lot. The checklist calls for trees to be accurately located and their diameter at breast height recorded.

Your plot plan should show: The supplied measured tree data, affected root zones, limits of disturbance and tree protection measures. We do not replace a tree professional's assessment or arboricultural prescription.

See Atlanta example plans ↓

Atlanta site plans we've drawn

Real plans for real Atlanta permits. Addresses, street names and owner details removed. Click a plan to see it full size.

Web images are resized and are not to scale. Your plan arrives as a scaled PDF.

Submitting your permit in Atlanta

Department of City Planning, Office of Buildings — Express Division

55 Trinity Avenue SW, 3rd Floor, Suite 3900, Atlanta, GA 30303

(404) 546-6907 · express-oob@atlantaga.gov

Express submission hours: Monday–Friday, 8:15 am–3:30 pm, excluding holidays (city policy effective Feb 1, 2025).

Express applications are in person under the Office of Buildings' posted policy; other workstreams use Accela. The general contacts page lists narrower walk-in transaction hours, so confirm before visiting. Permit operations pause Dec 10, 2026 at 5:00 pm through Dec 21 at 8:00 am for the planned ATL OPAL launch. Check the transition notice before submitting.

Submission route
Express is in person under the February 2025 policy. Use the Office of Buildings page for current instructions, not an older online Express packet. Office of Buildings: current policies
Service pause
Accela will be unavailable during the Dec 10–21, 2026 transition. ATL OPAL is scheduled to launch Dec 21 at 8:00 am. ATL OPAL: December 2026 service pause and launch
Review time
The published pool checklist says applications can be processed within 10 business days after acceptance and initial deposit. This is a checklist target, not a promised approval time or a timeline for other permits. Pool permit checklist (PDF, Oct 2021)
Listed fees
City fee table: fences 6′ or less $75; fences over 6′ $120; retaining walls $220; paving/driveways $200; one- and two-family pools/spas $240. These are listed permit items, not a quote for the full application. Getting started: permits and fees
Codes
2024 IRC, IBC and Swimming Pool & Spa Code with Georgia amendments; 2023 NEC with Georgia amendments. All new applications must use the newly adopted codes beginning Feb 1, 2026. Current Georgia construction codes
Tree review
Arborist Division: (404) 330-6874; arborist.dpcd@atlantaga.gov. A pre-submittal meeting is required where work may affect trees. Office of Buildings: current policies

Official forms and maps

Links checked Nov 25, 2026. Requirements change. Confirm with the city before you submit.

Choose your Atlanta site plan

Basic Plot Plan

$99
  • Lot lines from GIS parcel data
  • Main building roofline
  • North arrow

Good for preliminary planning. Not enough for Atlanta's fence, shed or deck checklist.

CHOOSE BASIC
PERMIT-READY · MOST POPULAR

Medium Site Plan

$119
  • Everything in Basic
  • Existing structures, driveway, trees and pool
  • Measurements to the GIS parcel lines

Our permit-ready pick for an Atlanta fence, shed or deck when no stamped survey or specialist plan is required.

CHOOSE MEDIUM

Detailed Site Plan

$159
  • Everything in Medium
  • Paths, patios, landscaping and gazebos
  • Septic and utilities you tell us about

For lots with more paving and site features. A detailed drawing does not replace a measured tree survey or specialist tree protection plan.

CHOOSE DETAILED

Add-ons at checkout: a structure that isn't built yet (your new shed, pool or fence), impervious surface calculation, custom sheet size, rush.

Order online

Give us the address and what you're building. Add your deed, an old survey or the city's comments if you have them.

We draw it

A drafter draws your plan from GIS parcel data and current satellite imagery. No site visit.

PDF in 24 hours

Your scaled plan arrives by email, ready to print or attach to your application.

Acceptance guarantee. If your permit office rejects your site plan, we'll revise it for free. If it's still not accepted after that revision, you get a full refund. Excludes plans that require a surveyor's or engineer's stamp.

What Atlanta customers say

★★★★★
Great service! Quick turnaround and consistent! Very happy with the service. Highly recommended.
Chad E. · Deck rebuild and screen enclosure, Atlanta · verified buyer

Plot plan, survey or something else?

We draw

Scaled site plans from GIS parcel data for fences, sheds, decks, detached garages, carports, patios and covers, pools, driveways, paving, retaining walls and screen enclosures. Send the dimensions and location of the work, plus any existing records.

You need a surveyor when

You're building a new home or an addition (we don't draw those), the Office of Buildings asks for a stamped survey, or a boundary is in doubt. GIS parcel lines don't settle a boundary dispute. The residential site-work checklist requires a signed, sealed boundary and topographic survey for work within or near a stream buffer, floodplain, wetland or sewer easement.

You need another professional when

Tree impacts can require measured tree data and a qualified tree professional. Grading plans and engineered retaining walls need the appropriate professional. We do not measure trees on site, design drainage, prepare structural calculations or provide an arboricultural prescription.

Atlanta site plan questions

Will the City of Atlanta accept a site plan from MySitePlan?

Atlanta's Express fence and shed/deck checklists allow a scaled site plan to be created when an old survey is unavailable. That is not blanket acceptance for every site or workstream: tree impacts, grading, floodplain conditions or a specific reviewer requirement may need specialist or sealed documents. If your permit office rejects your site plan, we'll revise it for free. If it's still not accepted after that revision, you get a full refund. Excludes plans that require a surveyor's or engineer's stamp.

Is my Atlanta mailing address enough to use this office?

No. Check the city's GIS city-limits layer before choosing a permit office. This page covers City of Atlanta only, including its portions in Fulton and DeKalb counties. Nearby cities such as Alpharetta and Roswell have their own permitting departments; a county name or Atlanta mailing address alone does not identify your permit office.

Does a small deck or fence need tree information?

The Express checklists ask for nearby trees. Under the 2026 Tree Protection Plan Checklist, the no-trees-impacted route is for sites with no trees within 50 feet of proposed construction; it requires at least two panoramic photos from different viewpoints and a signed Tree Impact Statement. Don't use the older Express sheets' 30-foot test. Where work may affect trees, arrange the Arborist Meeting before submitting.

What tree data should I send with my order?

Send the measured tree survey and any tree professional's plan or reviewer comments you already have. The 2026 checklist calls for a tree survey no older than 2 years, affected critical root zones, tree locations and diameters, and boundary trees. It lists hardwoods at least 6 inches DBH and pines at least 12 inches DBH. We cannot verify those measurements from satellite imagery.

Can I use the setbacks shown on the city's sample?

No. The sample illustrates what to show, not the permitted design for your lot. Check the zoning district, any overlay or historic controls, easements and any site-specific approvals. The sample also says lot dimensions must match city records and directs discrepancies to Zoning for coordination and sign-off.

Can I apply for an Express permit online?

The Office of Buildings' policy effective February 1, 2025 says Express applications must be submitted in person. Other workstreams use Accela. The city has announced a service pause from December 10, 2026 at 5:00 pm to December 21 at 8:00 am, followed by the ATL OPAL launch. Check the official transition page and confirm the submission route before you apply.

Does the site plan include my pool or deck construction drawings?

No. We draw the site layout. Atlanta's checklists also require applicable architectural, structural or pool-detail documents, which you obtain separately. Pool construction applications have been separate from other applications since January 2, 2025, with separate trade permits and inspections.

Which building codes should my construction documents list?

Use the city's current construction-codes page, not the 2018 code lists still printed in older checklists. Atlanta now lists the 2024 IRC, IBC and Swimming Pool & Spa Code with Georgia amendments and the 2023 NEC with Georgia amendments. Its transition notice requires the newly adopted codes for all new applications beginning February 1, 2026.

Get your Atlanta site plan by this time tomorrow

A scaled site plan for your Atlanta permit packet. Tree, structural and sealed documents remain separate when required.

ORDER AN ATLANTA SITE PLAN

More Georgia permit offices: Georgia site plans

×