How Gordon R. from Kent, Washington got his Site Plan for a Septic to Sewer Permit.

The Project

Gordon R. needed a site plan for his Septic to Sewer Permit in Kent, Washington. They wanted a fast and easy solution.

The Site Plan Package

Detailed Site Plan - Perfect for 
Septic to Sewer Permit.
Gordon R. chose our Detailed Site Plan because it offered exactly what his city required.

What Detailed Site Plan Includes:

Property Lines

Lot Dimensions

North Arrow

Scale

Measurements Between Features

Proposed Structures

Septic Tank

Driveway

Walkway

Electric Pole

Shed

Trees

★★★★★
Efficient

I needed a site plan for converting from septic to sewer and MySitePlan was very fast and efficient as I had the site plan within 24hrs. Permits all approved and ready to move forward. Thank you!

Gordon R.

Get Your Septic to Sewer Permit Approved Fast - See All Packages 

Requirements For A Septic to Sewer Permit

Gordon R. needed a Detailed Site Plan to apply for a septic to sewer conversion permit for his residential property located in Kent, Washington. The project, while more specialized in nature, still required the same standard set of details to satisfy local permit guidelines. These included a proper representation of the property boundaries, the location of existing and proposed utility lines, structures, driveways, and setbacks—all presented clearly and precisely on a plan suitable for submission to the city. While septic to sewer conversions aren't everyday requests, Gordon had no issues specifying what was needed, and the process moved forward smoothly.

Project Type

Septic to Sewer Permit

Delivery Time

12hrs

Revisions

Zero

File Type

PDF

PROCESS DETAILS

Drafting A Site Plan For A Septic to Sewer Permit

After receiving his order, we began by verifying that Gordon’s property was fully visible and not hindered by foliage or poor satellite coverage. Once confirmed, we utilized high-resolution GIS data and satellite imagery to begin drafting the Detailed Site Plan. All required components were carefully plotted—including utility access points and the proposed sewer connection line. Even though the project had its unique characteristics, no complications arose, and our team was able to complete and deliver the final plan in just 12 hours. The finished plan met all the submission requirements and helped keep Gordon’s timeline on track.

SOLUTION DETAILS

A Detailed Site Plan Approved

At MySitePlan, we understand that projects come in all types—whether it’s a routine permit or something more unique, like a utility conversion. What doesn’t change is our commitment to accuracy, speed, and friendly service. Gordon left us a colorful and heartfelt review, expressing his gratitude for how quickly and efficiently we delivered exactly what he needed. With his permits approved without issue, he was able to move forward confidently with the next steps of his project. Gordon is now one of many customers who’ve experienced firsthand how MySitePlan turns paperwork into progress—swiftly and without the stress.

The #1 site plan drafting service for contracts, property managers, and tenants.

We've worked with hundreds of leading companies.

We’ve delivered more site plans than all our competitors combined

We’re the one with a 100% Money-back Guarantee*

Our Denver-based customer service team is friendly and responsive

CERTIFIED REVIEWS

Loved by thousands of homeowners, contractors, and property managers.

We’ll just let our customers do the talking for us.

WHERE WE WORK

Site Plans approved in every county in every state*

*Except California… click here to find out why.

Kent, WA Septic to Sewer Permit Site Plan FAQs

Frequently Asked Questions About Site Plans and Permits in Kent, Washington

In Kent, a site plan is required to illustrate the existing septic system and the proposed sewer connection, ensuring compliance with local regulations. MySitePlan.com provides detailed site plans that meet these specific municipal standards.

MySitePlan.com offers detailed site plans that include all necessary elements such as property boundaries, existing structures, septic systems, and proposed sewer lines, ensuring your permit application in Kent is complete and compliant.

To create an accurate site plan, provide your property address, dimensions, existing structures, location of the septic system, and details of the proposed sewer connection. If available, a copy of your property survey can enhance the plan's precision.

MySitePlan.com typically delivers site plans within 24 hours. In a recent case study for Kent, the detailed site plan was completed and delivered in just 12 hours.

Yes, MySitePlan.com's site plans are designed to meet Kent's building department requirements. They offer unlimited revisions to ensure your plan is approved.

The cost for a detailed site plan suitable for a septic to sewer permit in Kent is $159. This includes all necessary details to meet local permitting requirements. For more information, visit MySitePlan.com.

Here's what one of our
6,000+  ★★★★★  reviews
has to say about My Site Plan.

★★★★★
Amazing Service

Thank you for completing my site plan so quickly. The whole process was easy and the customer service and communication was excellent. I'd recommend My Site Plan.

Nancy K.
×